Battery Storage (1105)

Battery Storage is a 104.5 MW battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at National Grid 115 kV Paxton Line A127-4.

104.5 MWCapacity
WithdrawnStatus
CMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1105
Statuswithdrawn
Source statusW
MarketCMA
TechnologyBattery
Capacity104.5 MW
StateMassachusetts
CountyWorcester
Point of interconnectionNational Grid 115 kV Paxton Line A127-4
Requested (queue) date2021-03-15
Proposed in-service date2025-05-15
Operational date
Withdrawn date2021-10-20
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata