Battery Storage (1143)

Battery Storage is a 508.2 MW battery interconnection project in Middlesex, Massachusetts with a current status of active. It is proposed to connect at Mystic 345 kV between breaker 101, 106 and 107.

508.2 MWCapacity
ActiveStatus
BOSTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1143
Statusactive
Source statusA
MarketBOST
TechnologyBattery
Capacity508.2 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionMystic 345 kV between breaker 101, 106 and 107
Requested (queue) date2021-06-15
Proposed in-service date2028-05-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.