Battery Storage (1193)

Battery Storage is a 325.0 MW battery interconnection project in Windham, Connecticut with a current status of withdrawn. It is proposed to connect at CL&P 345 kV 3271 Line.

325.0 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1193
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity325.0 MW
StateConnecticut
CountyWindham
Point of interconnectionCL&P 345 kV 3271 Line
Requested (queue) date2021-11-09
Proposed in-service date2028-05-12
Operational date
Withdrawn date2025-05-30
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.