Battery Storage (1206)

Battery Storage is a 200.0 MW battery interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at MA_NGRID Adams 115kV substation Bus ID: 113005.

200.0 MWCapacity
WithdrawnStatus
WMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1206
Statuswithdrawn
Source statusW
MarketWMA
TechnologyBattery
Capacity200.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionMA_NGRID Adams 115kV substation Bus ID: 113005
Requested (queue) date2021-12-30
Proposed in-service date2024-12-31
Operational date
Withdrawn date2022-03-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.