Battery Storage (1223)

Battery Storage is a 10.0 MW battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at ZP Battery DevCo, LLC, 13.2kV, National Grid Feeder #413L3.

10.0 MWCapacity
WithdrawnStatus
CMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1223
Statuswithdrawn
Source statusW
MarketCMA
TechnologyBattery
Capacity10.0 MW
StateMassachusetts
CountyWorcester
Point of interconnectionZP Battery DevCo, LLC, 13.2kV, National Grid Feeder #413L3
Requested (queue) date2022-01-18
Proposed in-service date2022-04-29
Operational date
Withdrawn date2022-03-15
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata