Battery Storage (1251)
Battery Storage is a 60.0 MW battery interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at To interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, QP 1030 is described as a line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1251 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Battery |
| Capacity | 60.0 MW |
| State | Connecticut |
| County | Hartford |
| Point of interconnection | To interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, QP 1030 is described as a line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks. |
| Requested (queue) date | 2022-04-11 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | 2022-08-26 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata