Battery Storage (1319)

Battery Storage is a 141.6 MW battery interconnection project in Litchfield, Connecticut with a current status of active. It is proposed to connect at 115 kV line between Rocky River and Bulls Bridge substations.

141.6 MWCapacity
ActiveStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1319
Statusactive
Source statusA
MarketCT
TechnologyBattery
Capacity141.6 MW
StateConnecticut
CountyLitchfield
Point of interconnection115 kV line between Rocky River and Bulls Bridge substations
Requested (queue) date2022-10-07
Proposed in-service date2029-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata