Battery Storage (1337)

Battery Storage is a 130.0 MW battery interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at 7,500' to Adams - NG Q117 VEL - 65,000' Bennington 115 kV line (42.72482385, -73.09931100). (The project site is on the western side of the transmission line off a gravel bank road and on the opposite side of the small solar array).

130.0 MWCapacity
WithdrawnStatus
WMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1337
Statuswithdrawn
Source statusW
MarketWMA
TechnologyBattery
Capacity130.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnection7,500' to Adams - NG Q117 VEL - 65,000' Bennington 115 kV line (42.72482385, -73.09931100). (The project site is on the western side of the transmission line off a gravel bank road and on the opposite side of the small solar array)
Requested (queue) date2022-11-22
Proposed in-service date2026-12-31
Operational date
Withdrawn date2023-11-17
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata