Battery Storage (1353)
Battery Storage is a 289.3 MW battery interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at Montville 4J between 4J-11T-2 and 4J-12T-2. Interconnected with Montville Unit 6. New Montville Unit 6 Generator breaker will be installed for sync control..
289.3 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1353 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Battery |
| Capacity | 289.3 MW |
| State | Connecticut |
| County | New London |
| Point of interconnection | Montville 4J between 4J-11T-2 and 4J-12T-2. Interconnected with Montville Unit 6. New Montville Unit 6 Generator breaker will be installed for sync control. |
| Requested (queue) date | 2023-02-06 |
| Proposed in-service date | 2027-10-01 |
| Operational date | — |
| Withdrawn date | 2025-10-10 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata