Battery Storage (1354)

Battery Storage is a 289.3 MW battery interconnection project in Middlesex, Connecticut with a current status of withdrawn. It is proposed to connect at POI between 5A-5T-2 and 5A-6T-2; Northeast Utilities 11631 Substation - Middletown.

289.3 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1354
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity289.3 MW
StateConnecticut
CountyMiddlesex
Point of interconnectionPOI between 5A-5T-2 and 5A-6T-2; Northeast Utilities 11631 Substation - Middletown
Requested (queue) date2023-02-06
Proposed in-service date2024-10-01
Operational date
Withdrawn date2023-04-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata