Battery Storage (1386)

Battery Storage is a 100.0 MW battery interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at National Grid Berkshire - Plainfield 115 kV line Lat/Long: 42.49627608454711, -73.01015449707741.

100.0 MWCapacity
WithdrawnStatus
WMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1386
Statuswithdrawn
Source statusW
MarketWMA
TechnologyBattery
Capacity100.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionNational Grid Berkshire - Plainfield 115 kV line Lat/Long: 42.49627608454711, -73.01015449707741
Requested (queue) date2023-04-26
Proposed in-service date2026-12-31
Operational date
Withdrawn date2024-10-04
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata