Battery Storage (1397)

Battery Storage is a 100.2 MW battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at 42.31815556, -71.98500556, Treasure Valley 115 kV Substation.

100.2 MWCapacity
WithdrawnStatus
CMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1397
Statuswithdrawn
Source statusW
MarketCMA
TechnologyBattery
Capacity100.2 MW
StateMassachusetts
CountyWorcester
Point of interconnection42.31815556, -71.98500556, Treasure Valley 115 kV Substation
Requested (queue) date2023-05-05
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-10-08
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata