Battery Storage (1415)
Battery Storage is a 261.9 MW battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at POI interconnection coordinates: 42.471953, -71.734165 Interconnecting to National Grid 345kV line (line ID: 343) via line tap (approx. 8.5 mi from Wachusett Substation and 14.9 mi from Sandy Pond Substation)..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1415 |
| Status | withdrawn |
| Source status | W |
| Market | CMA |
| Technology | Battery |
| Capacity | 261.9 MW |
| State | Massachusetts |
| County | Worcester |
| Point of interconnection | POI interconnection coordinates: 42.471953, -71.734165 Interconnecting to National Grid 345kV line (line ID: 343) via line tap (approx. 8.5 mi from Wachusett Substation and 14.9 mi from Sandy Pond Substation). |
| Requested (queue) date | 2023-06-20 |
| Proposed in-service date | 2024-08-12 |
| Operational date | — |
| Withdrawn date | 2024-09-26 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.