Battery Storage (1422)

Battery Storage is a 326.0 MW battery interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Barbour Hill Substation 115kV direct connection ( 41.854810, -72.528106).

326.0 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1422
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity326.0 MW
StateConnecticut
CountyHartford
Point of interconnectionBarbour Hill Substation 115kV direct connection ( 41.854810, -72.528106)
Requested (queue) date2023-07-07
Proposed in-service date2029-02-02
Operational date
Withdrawn date2025-04-25
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata