Battery Storage (1423)
Battery Storage is a 121.6 MW battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at The Primary Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property which will connect to National Grid T-Line H160 (Northboro Rd to Hudson) at 115 KV. The approximate line-break location will be 0.26 miles from Northboro Rd substation and 7.92 miles from Hudson Substation. The Alternative POI will be a new 3-breaker ring bus located on the IC’s property which connects to T-Line N166 (Northboro Rd to N.Marloboro) at 115 KV..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1423 |
| Status | withdrawn |
| Source status | W |
| Market | CMA |
| Technology | Battery |
| Capacity | 121.6 MW |
| State | Massachusetts |
| County | Worcester |
| Point of interconnection | The Primary Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property which will connect to National Grid T-Line H160 (Northboro Rd to Hudson) at 115 KV. The approximate line-break location will be 0.26 miles from Northboro Rd substation and 7.92 miles from Hudson Substation. The Alternative POI will be a new 3-breaker ring bus located on the IC’s property which connects to T-Line N166 (Northboro Rd to N.Marloboro) at 115 KV. |
| Requested (queue) date | 2023-07-10 |
| Proposed in-service date | 2026-09-01 |
| Operational date | — |
| Withdrawn date | 2024-09-04 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.