Battery Storage (1434)

Battery Storage is a 160.0 MW battery interconnection project in Franklin, Massachusetts with a current status of withdrawn. It is proposed to connect at Lat Long is 42.6254349775399, -72.56881378900127 The NG Harriman - Montague 115 kV line (Y-177) Distances: 3.35 miles to Montague and 20.67 miles to Harriman.

160.0 MWCapacity
WithdrawnStatus
WMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1434
Statuswithdrawn
Source statusW
MarketWMA
TechnologyBattery
Capacity160.0 MW
StateMassachusetts
CountyFranklin
Point of interconnectionLat Long is 42.6254349775399, -72.56881378900127 The NG Harriman - Montague 115 kV line (Y-177) Distances: 3.35 miles to Montague and 20.67 miles to Harriman
Requested (queue) date2023-08-15
Proposed in-service date2027-12-31
Operational date
Withdrawn date2024-06-19
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata