Battery Storage (1462)
Battery Storage is a 115.0 MW battery interconnection project in Norfolk, Massachusetts with a current status of withdrawn. It is proposed to connect at Tap on Belmont 115 kV - Stoughton Tap 115 kV Line with three breaker ring bus scheme. POI is located at the 1.75 miles from Stoughton 115kV substation and the 2.8 miles from Belmont Substation. Latitude: 42.09564, Longitude: -71.08200.
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1462 |
| Status | withdrawn |
| Source status | W |
| Market | SEMA |
| Technology | Battery |
| Capacity | 115.0 MW |
| State | Massachusetts |
| County | Norfolk |
| Point of interconnection | Tap on Belmont 115 kV - Stoughton Tap 115 kV Line with three breaker ring bus scheme. POI is located at the 1.75 miles from Stoughton 115kV substation and the 2.8 miles from Belmont Substation. Latitude: 42.09564, Longitude: -71.08200 |
| Requested (queue) date | 2023-11-27 |
| Proposed in-service date | 2029-12-20 |
| Operational date | — |
| Withdrawn date | 2024-02-20 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.