Battery Storage (1501)

Battery Storage is a 167.1 MW battery interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at Primary POI: 115kV line 1080 (41.5515028, -72.1253556) , Alternate POI: 115kV line 1000 (41.551478, -72.125294).

167.1 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1501
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity167.1 MW
StateConnecticut
CountyNew London
Point of interconnectionPrimary POI: 115kV line 1080 (41.5515028, -72.1253556) , Alternate POI: 115kV line 1000 (41.551478, -72.125294)
Requested (queue) date2024-02-29
Proposed in-service date2028-04-01
Operational date
Withdrawn date2024-12-11
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata