Battery Storage (1501)
Battery Storage is a 167.1 MW battery interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at Primary POI: 115kV line 1080 (41.5515028, -72.1253556) , Alternate POI: 115kV line 1000 (41.551478, -72.125294).
167.1 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1501 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Battery |
| Capacity | 167.1 MW |
| State | Connecticut |
| County | New London |
| Point of interconnection | Primary POI: 115kV line 1080 (41.5515028, -72.1253556) , Alternate POI: 115kV line 1000 (41.551478, -72.125294) |
| Requested (queue) date | 2024-02-29 |
| Proposed in-service date | 2028-04-01 |
| Operational date | — |
| Withdrawn date | 2024-12-11 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata