Battery Storage (1509)

Battery Storage is a 152.8 MW battery interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at 3-breaker ring bus tapping the W175 line. ESA sub located approximately 0.23 miles from West Charlton 115 kV substation at current coordinates 42° 8'10.02"N 72° 1'30.37"W.

152.8 MWCapacity
WithdrawnStatus
CMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1509
Statuswithdrawn
Source statusW
MarketCMA
TechnologyBattery
Capacity152.8 MW
StateMassachusetts
CountyWorcester
Point of interconnection3-breaker ring bus tapping the W175 line. ESA sub located approximately 0.23 miles from West Charlton 115 kV substation at current coordinates 42° 8'10.02"N 72° 1'30.37"W
Requested (queue) date2024-04-03
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-10-07
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.