Battery Storage (1513)

Battery Storage is a 300.0 MW battery interconnection project in Worcester, Massachusetts with a current status of active. It is proposed to connect at Bear Swamp- Pratts Junction 230kV.

300.0 MWCapacity
ActiveStatus
CMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1513
Statusactive
Source statusA
MarketCMA
TechnologyBattery
Capacity300.0 MW
StateMassachusetts
CountyWorcester
Point of interconnectionBear Swamp- Pratts Junction 230kV
Requested (queue) date2024-04-08
Proposed in-service date2028-08-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata