Battery Storage (1518)

Battery Storage is a 136.0 MW battery interconnection project in Berkshire, Massachusetts with a current status of active. It is proposed to connect at Eversource, New Substation to be built at 42.488290, -73.219503.

136.0 MWCapacity
ActiveStatus
WMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1518
Statusactive
Source statusA
MarketWMA
TechnologyBattery
Capacity136.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionEversource, New Substation to be built at 42.488290, -73.219503
Requested (queue) date2024-04-09
Proposed in-service date2028-08-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata