Battery Storage is a 170.0 MW battery interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at MA_WMECO Blandford 115kV substation.

170.0 MWCapacity
WithdrawnStatus
WMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1542
Statuswithdrawn
Source statusW
MarketWMA
TechnologyBattery
Capacity170.0 MW
StateMassachusetts
CountyHampden
Point of interconnectionMA_WMECO Blandford 115kV substation
Requested (queue) date2024-05-28
Proposed in-service date2029-12-31
Operational date
Withdrawn date2026-07-01
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata