Battery Storage (1551)
Battery Storage is a 180.0 MW battery interconnection project in Worcester, Massachusetts with a current status of active. It is proposed to connect at The Point of Interconnection will be located on the IC’s property (Lat, long: 42°21'44.53"N, 72° 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID..
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 1551 |
| Status | active |
| Source status | A |
| Market | CMA |
| Technology | Battery |
| Capacity | 180.0 MW |
| State | Massachusetts |
| County | Worcester |
| Point of interconnection | The Point of Interconnection will be located on the IC’s property (Lat, long: 42°21'44.53"N, 72° 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID. |
| Requested (queue) date | 2024-05-31 |
| Proposed in-service date | 2028-04-27 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata