Battery Storage (1551)

Battery Storage is a 180.0 MW battery interconnection project in Worcester, Massachusetts with a current status of active. It is proposed to connect at The Point of Interconnection will be located on the IC’s property (Lat, long: 42°21'44.53"N, 72° 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID..

180.0 MWCapacity
ActiveStatus
CMAMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1551
Statusactive
Source statusA
MarketCMA
TechnologyBattery
Capacity180.0 MW
StateMassachusetts
CountyWorcester
Point of interconnectionThe Point of Interconnection will be located on the IC’s property (Lat, long: 42°21'44.53"N, 72° 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID.
Requested (queue) date2024-05-31
Proposed in-service date2028-04-27
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata