Battery Storage (1562)

Battery Storage is a 45.3 MW battery interconnection project in Litchfield, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource 115 kV Line from Frost Bridge #8R to Carmel Hill #11S.

45.3 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameBattery Storage
Queue ID1562
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity45.3 MW
StateConnecticut
CountyLitchfield
Point of interconnectionEversource 115 kV Line from Frost Bridge #8R to Carmel Hill #11S
Requested (queue) date2024-06-07
Proposed in-service date2027-06-01
Operational date
Withdrawn date2024-08-28
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.