Battery Storage (847)
Battery Storage is a 150.0 MW battery interconnection project in Essex, Massachusetts with a current status of withdrawn. It is proposed to connect at Primary POI: Expand NGRID S.Danvers 115 kV substation by connecting to B-154N line Alternative POI: Tap B-154N line two spans west of the S. Danvers substation to construct a new three-breaker ring bus.
Project facts
| Canonical name | Battery Storage |
|---|---|
| Queue ID | 847 |
| Status | withdrawn |
| Source status | W |
| Market | BOST |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | Massachusetts |
| County | Essex |
| Point of interconnection | Primary POI: Expand NGRID S.Danvers 115 kV substation by connecting to B-154N line Alternative POI: Tap B-154N line two spans west of the S. Danvers substation to construct a new three-breaker ring bus |
| Requested (queue) date | 2019-03-19 |
| Proposed in-service date | 2023-05-31 |
| Operational date | — |
| Withdrawn date | 2020-03-06 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata