Battery Storage + Solar (1512)
Battery Storage + Solar is a 100.5 MW solar+battery interconnection project in Franklin, Massachusetts with a current status of withdrawn. It is proposed to connect at New England Power Co, 115 kV, 2.25 miles from E131 TAP 113010 and 3.29 miles from HARRIMAN 113146) (115 kV).
100.5 MWCapacity
WithdrawnStatus
WMAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Battery Storage + Solar |
|---|---|
| Queue ID | 1512 |
| Status | withdrawn |
| Source status | W |
| Market | WMA |
| Technology | Solar+Battery |
| Capacity | 100.5 MW |
| State | Massachusetts |
| County | Franklin |
| Point of interconnection | New England Power Co, 115 kV, 2.25 miles from E131 TAP 113010 and 3.29 miles from HARRIMAN 113146) (115 kV) |
| Requested (queue) date | 2024-04-08 |
| Proposed in-service date | 2027-12-31 |
| Operational date | — |
| Withdrawn date | 2024-05-29 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata