Bay Shore-Fostoria 345kV & Bay Shore-Monroe 345kV (AA1-056)

Bay Shore-Fostoria 345kV & Bay Shore-Monroe 345kV is a 161.0 MW gas interconnection project in Lucas, Ohio with a current status of operational.

161.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameBay Shore-Fostoria 345kV & Bay Shore-Monroe 345kV
Queue IDAA1-056
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity161.0 MW
StateOhio
CountyLucas
Point of interconnection
Requested (queue) date2014-09-10
Proposed in-service date
Operational date2017-05-15
Withdrawn date
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata