Bayshore-GM Powertrain 138 kV & Lallendorf 345kV (AB1-107)

Bayshore-GM Powertrain 138 kV & Lallendorf 345kV is a 955.0 MW gas interconnection project in Lucas, Ohio with a current status of withdrawn.

955.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameBayshore-GM Powertrain 138 kV & Lallendorf 345kV
Queue IDAB1-107
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity955.0 MW
StateOhio
CountyLucas
Point of interconnection—
Requested (queue) date2015-10-22
Proposed in-service date2024-11-30
Operational date—
Withdrawn date2023-09-12
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.