Bayside 2 BESS (24INR0236)

Bayside 2 BESS is a 252.3 MW battery interconnection project in DeWitt, Texas with a current status of suspended.

252.3 MWCapacity
SuspendedStatus
DeWittMarket
BatteryTechnology

Project facts

Canonical nameBayside 2 BESS
Queue ID24INR0236
Statussuspended
Source status
MarketDeWitt
TechnologyBattery
Capacity252.3 MW
StateTexas
CountyDeWitt
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectsuspendedhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata