Beacon Falls Energy Park CNR only (706)

Beacon Falls Energy Park CNR only is a 62.9 MW other interconnection project in New Haven, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource, Beacon Falls Substation, 180 Cold Spring Rd, Beacon Falls, Junction of the 115 kV lines 1570-1 and 1319.

62.9 MWCapacity
WithdrawnStatus
CTMarket
OtherTechnology

Project facts

Canonical nameBeacon Falls Energy Park CNR only
Queue ID706
Statuswithdrawn
Source statusW
MarketCT
TechnologyOther
Capacity62.9 MW
StateConnecticut
CountyNew Haven
Point of interconnectionEversource, Beacon Falls Substation, 180 Cold Spring Rd, Beacon Falls, Junction of the 115 kV lines 1570-1 and 1319
Requested (queue) date2018-02-21
Proposed in-service date2022-04-01
Operational date
Withdrawn date2020-01-30
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.