Beacon Falls Energy Park CNR only (706)
Beacon Falls Energy Park CNR only is a 62.9 MW other interconnection project in New Haven, Connecticut with a current status of withdrawn. It is proposed to connect at Eversource, Beacon Falls Substation, 180 Cold Spring Rd, Beacon Falls, Junction of the 115 kV lines 1570-1 and 1319.
62.9 MWCapacity
WithdrawnStatus
CTMarket
OtherTechnology
Project facts
| Canonical name | Beacon Falls Energy Park CNR only |
|---|---|
| Queue ID | 706 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Other |
| Capacity | 62.9 MW |
| State | Connecticut |
| County | New Haven |
| Point of interconnection | Eversource, Beacon Falls Substation, 180 Cold Spring Rd, Beacon Falls, Junction of the 115 kV lines 1570-1 and 1319 |
| Requested (queue) date | 2018-02-21 |
| Proposed in-service date | 2022-04-01 |
| Operational date | — |
| Withdrawn date | 2020-01-30 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata