Beacon Harbor Solar (C24-121)

Beacon Harbor Solar is a 195.0 MW solar+battery interconnection project in Jefferson, New York with a current status of withdrawn. It is proposed to connect at Thousand Islands-Coffeen Line 4: Lyme Tap 115kV.

195.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameBeacon Harbor Solar
Queue IDC24-121
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity195.0 MW
StateNew York
CountyJefferson
Point of interconnectionThousand Islands-Coffeen Line 4: Lyme Tap 115kV
Requested (queue) date2024-09-03
Proposed in-service date
Operational date
Withdrawn date
DeveloperBeacon Harbor Solar Project, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.