Bear Creek Solar (Orinda) (67169_EBMUD)

Bear Creek Solar (Orinda) is a 5.0 MW solar interconnection project in Contra Costa, California with a current status of operational.

5.0 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameBear Creek Solar (Orinda)
Queue ID67169_EBMUD
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity5.0 MW
StateCalifornia
CountyContra Costa
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-04-01
Withdrawn date—
Developer—
Utility / transmission ownerSolar Star California XIX, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata