Bear Rock-Johnstown 230 kV (AE2-224)

Bear Rock-Johnstown 230 kV is a 100.0 MW solar interconnection project in Cambria, Pennsylvania with a current status of operational.

100.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameBear Rock-Johnstown 230 kV
Queue IDAE2-224
Statusoperational
Source statusIn Service
Market—
TechnologySolar
Capacity100.0 MW
StatePennsylvania
CountyCambria
Point of interconnection—
Requested (queue) date2019-03-23
Proposed in-service date—
Operational date2023-11-17
Withdrawn date—
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata