Bear Swamp Pump Load increase (1264)

Bear Swamp Pump Load increase is a 333.0 MW other interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at The existing POI of the Bear Swamp generating station..

333.0 MWCapacity
OperationalStatus
WMAMarket
OtherTechnology

Project facts

Canonical nameBear Swamp Pump Load increase
Queue ID1264
Statusoperational
Source statusC
MarketWMA
TechnologyOther
Capacity333.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionThe existing POI of the Bear Swamp generating station.
Requested (queue) date2022-05-19
Proposed in-service date
Operational date2023-01-06
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.