Bear Swamp Pump Load increase (1264)
Bear Swamp Pump Load increase is a 333.0 MW other interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at The existing POI of the Bear Swamp generating station..
333.0 MWCapacity
OperationalStatus
WMAMarket
OtherTechnology
Project facts
| Canonical name | Bear Swamp Pump Load increase |
|---|---|
| Queue ID | 1264 |
| Status | operational |
| Source status | C |
| Market | WMA |
| Technology | Other |
| Capacity | 333.0 MW |
| State | Massachusetts |
| County | Berkshire |
| Point of interconnection | The existing POI of the Bear Swamp generating station. |
| Requested (queue) date | 2022-05-19 |
| Proposed in-service date | — |
| Operational date | 2023-01-06 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata