Beaverhead Solar SLF (27INR0307)

Beaverhead Solar SLF is a 61.5 MW solar interconnection project in Jim Wells, Texas with a current status of operational. It is proposed to connect at Direct to Sub 69kv #5653 Ben Bolt..

61.5 MWCapacity
OperationalStatus
Jim WellsMarket
SolarTechnology

Project facts

Canonical nameBeaverhead Solar SLF
Queue ID27INR0307
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJim Wells
TechnologySolar
Capacity61.5 MW
StateTexas
CountyJim Wells
Point of interconnectionDirect to Sub 69kv #5653 Ben Bolt.
Requested (queue) date2024-08-16
Proposed in-service date
Operational date2029-05-11
Withdrawn date
DeveloperBeaverhead Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata