Becerra Creek Storage 1 (26INR0024)

Becerra Creek Storage 1 is a 125.6 MW other interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at 345 kV Cenizo Substation (#80220).

125.6 MWCapacity
OperationalStatus
WebbMarket
OtherTechnology

Project facts

Canonical nameBecerra Creek Storage 1
Queue ID26INR0024
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWebb
TechnologyOther
Capacity125.6 MW
StateTexas
CountyWebb
Point of interconnection345 kV Cenizo Substation (#80220)
Requested (queue) date2022-09-21
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperBordas Renewable Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata