Bedington Energy Facility (AE2-333)

Bedington Energy Facility is a 100.0 MW solar interconnection project in Frederick, Maryland with a current status of suspended. It is proposed to connect at Bedington 138 kV.

100.0 MWCapacity
SuspendedStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameBedington Energy Facility
Queue IDAE2-333
Statussuspended
Source statussuspended
MarketPJM
TechnologySolar
Capacity100.0 MW
StateMaryland
CountyFrederick
Point of interconnectionBedington 138 kV
Requested (queue) date2019-04-01
Proposed in-service date2025-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.