Beech Creek 12.47 kV is a 1.2 MW solar interconnection project in Clinton, Pennsylvania with a current status of withdrawn.

1.2 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameBeech Creek 12.47 kV
Queue IDAF2-293
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity1.2 MW
StatePennsylvania
CountyClinton
Point of interconnection—
Requested (queue) date2020-03-28
Proposed in-service date2026-04-09
Operational date—
Withdrawn date2024-03-11
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.