Belfield-Rhame 230kV (GEN-2015-091)

Belfield-Rhame 230kV is a 101.2 MW wind interconnection project in Stark, North Dakota with a current status of withdrawn. It is proposed to connect at Belfield-Rhame 230kV.

101.2 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameBelfield-Rhame 230kV
Queue IDGEN-2015-091
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity101.2 MW
StateNorth Dakota
CountyStark
Point of interconnectionBelfield-Rhame 230kV
Requested (queue) date2015-10-15
Proposed in-service date
Operational date
Withdrawn date2017-06-09
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata