Bell Ridge Solar is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of operational.

74.5 MWCapacity
OperationalStatus
SECMarket
SolarTechnology

Project facts

Canonical nameBell Ridge Solar
Queue ID65519_BRS
Statusoperational
Source status(OP) Operating
MarketSEC
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyGilchrist
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-09-01
Withdrawn date
Developer
Utility / transmission ownerBell Ridge Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata