Bellevue Substation (L0528)
Bellevue Substation is a 7.0 MW other interconnection project in Franklin, Washington with a current status of active. It is proposed to connect at BBEC's proposed LaPorte 115 kV line, north of Selph Landing Road and Bellevue Road in Pasco, WA.
7.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Bellevue Substation |
|---|---|
| Queue ID | L0528 |
| Status | active |
| Source status | STUDY COMPLETED |
| Market | WA |
| Technology | Other |
| Capacity | 7.0 MW |
| State | Washington |
| County | Franklin |
| Point of interconnection | BBEC's proposed LaPorte 115 kV line, north of Selph Landing Road and Bellevue Road in Pasco, WA |
| Requested (queue) date | 2022-05-13 |
| Proposed in-service date | 2025-05-09 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Big Bend Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata