Bellevue Substation (L0528)

Bellevue Substation is a 7.0 MW other interconnection project in Franklin, Washington with a current status of active. It is proposed to connect at BBEC's proposed LaPorte 115 kV line, north of Selph Landing Road and Bellevue Road in Pasco, WA.

7.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameBellevue Substation
Queue IDL0528
Statusactive
Source statusSTUDY COMPLETED
MarketWA
TechnologyOther
Capacity7.0 MW
StateWashington
CountyFranklin
Point of interconnectionBBEC's proposed LaPorte 115 kV line, north of Selph Landing Road and Bellevue Road in Pasco, WA
Requested (queue) date2022-05-13
Proposed in-service date2025-05-09
Operational date
Withdrawn date
DeveloperBig Bend Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata