Big Bend Electric Cooperative, Inc. — Interconnection Portfolio
Big Bend Electric Cooperative, Inc. is associated with 6 tracked interconnection projects representing 118 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
6Projects
3Active
2Operational
1Withdrawn
118 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 6 | 118 MW |
Geographic footprint
| State | Projects |
|---|---|
| Washington | 6 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Radar Hill Substation | L0421 | Other | 40.0 MW | operational | Walla Walla, Washington |
| Herman Substation | L0442 | Other | 38.7 MW | withdrawn | Adams, Washington |
| Vineyard Substation | L0522 | Other | 14.0 MW | active | Franklin, Washington |
| BBEC - Camp Sub | L0509 | Other | 11.0 MW | active | Franklin, Washington |
| LaPorte | L0455 | Other | 7.2 MW | operational | Benton, Washington |
| Bellevue Substation | L0528 | Other | 7.0 MW | active | Franklin, Washington |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor Big Bend Electric Cooperative, Inc.'s portfolio across all markets.