BELTRAN SOLAR (1118)

BELTRAN SOLAR is a 300.0 MW solar interconnection project in Stanislaus, California with a current status of withdrawn. It is proposed to connect at Westley-Quinto 230 kV line.

300.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBELTRAN SOLAR
Queue ID1118
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity300.0 MW
StateCalifornia
CountyStanislaus
Point of interconnectionWestley-Quinto 230 kV line
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2016-05-02
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.