Bendito Wind (29INR0117)

Bendito Wind is a 300.0 MW other interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at Tap 345 kV80220 Cenizo - 80079 Cruce Ckt 2.

300.0 MWCapacity
OperationalStatus
WebbMarket
OtherTechnology

Project facts

Canonical nameBendito Wind
Queue ID29INR0117
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWebb
TechnologyOther
Capacity300.0 MW
StateTexas
CountyWebb
Point of interconnectionTap 345 kV80220 Cenizo - 80079 Cruce Ckt 2
Requested (queue) date2025-07-29
Proposed in-service date
Operational date2029-07-13
Withdrawn date
DeveloperBendito Wind Farm, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata