Bent Tree Wind Farm Phase 1 (57198_1)

Bent Tree Wind Farm Phase 1 is a 201.3 MW wind interconnection project in Freeborn, Minnesota with a current status of operational.

201.3 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameBent Tree Wind Farm Phase 1
Queue ID57198_1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity201.3 MW
StateMinnesota
CountyFreeborn
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-02-01
Withdrawn date
Developer
Utility / transmission ownerWisconsin Power & Light Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata