Berkman Storage (24INR0395)

Berkman Storage is a 150.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at 138 kV League City (Bus# 38920).

150.9 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameBerkman Storage
Queue ID24INR0395
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity150.9 MW
State
County
Point of interconnection138 kV League City (Bus# 38920)
Requested (queue) date2022-08-05
Proposed in-service date2027-05-31
Operational date
Withdrawn date2025-03-17
DeveloperBerkman Storage, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata