Berkshire Wind CNR (1010)

Berkshire Wind CNR is a 19.6 MW wind interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at Eversource 15-E 4 circuit. Interconnection Circuit connects to 115 KV transmission system at Partridge Substation in Pittsfield MA.

19.6 MWCapacity
OperationalStatus
WMAMarket
WindTechnology

Project facts

Canonical nameBerkshire Wind CNR
Queue ID1010
Statusoperational
Source statusC
MarketWMA
TechnologyWind
Capacity19.6 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionEversource 15-E 4 circuit. Interconnection Circuit connects to 115 KV transmission system at Partridge Substation in Pittsfield MA
Requested (queue) date2020-04-10
Proposed in-service date
Operational date2021-09-13
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata