Berkshire Wind Increase (396)

Berkshire Wind Increase is a 4.6 MW wind interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at WMECO 23 kV from Partridge substation.

4.6 MWCapacity
OperationalStatus
WMAMarket
WindTechnology

Project facts

Canonical nameBerkshire Wind Increase
Queue ID396
Statusoperational
Source statusC
MarketWMA
TechnologyWind
Capacity4.6 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionWMECO 23 kV from Partridge substation
Requested (queue) date2012-08-28
Proposed in-service date
Operational date2019-11-19
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata