Berkshire Wind Increase (396)
Berkshire Wind Increase is a 4.6 MW wind interconnection project in Berkshire, Massachusetts with a current status of operational. It is proposed to connect at WMECO 23 kV from Partridge substation.
4.6 MWCapacity
OperationalStatus
WMAMarket
WindTechnology
Project facts
| Canonical name | Berkshire Wind Increase |
|---|---|
| Queue ID | 396 |
| Status | operational |
| Source status | C |
| Market | WMA |
| Technology | Wind |
| Capacity | 4.6 MW |
| State | Massachusetts |
| County | Berkshire |
| Point of interconnection | WMECO 23 kV from Partridge substation |
| Requested (queue) date | 2012-08-28 |
| Proposed in-service date | — |
| Operational date | 2019-11-19 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata