Berry Farm Storage (C24-264)
Berry Farm Storage is a 120.0 MW battery interconnection project in Chautauqua, New York with a current status of withdrawn. It is proposed to connect at L160 115 kV line (Dunkirk and Falconer).
120.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology
Project facts
| Canonical name | Berry Farm Storage |
|---|---|
| Queue ID | C24-264 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | NYISO |
| Technology | Battery |
| Capacity | 120.0 MW |
| State | New York |
| County | Chautauqua |
| Point of interconnection | L160 115 kV line (Dunkirk and Falconer) |
| Requested (queue) date | 2024-09-23 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Berry Farm Storage 1, LLC |
| Utility / transmission owner | NM-NG |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.