BESS TX Camarine - BSHOU001 (69246_BSOU1)

BESS TX Camarine - BSHOU001 is a 9.9 MW battery interconnection project in Harris, Texas with a current status of active.

9.9 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameBESS TX Camarine - BSHOU001
Queue ID69246_BSOU1
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketERCO
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyHarris
Point of interconnection
Requested (queue) date
Proposed in-service date2026-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPrologis Logistics Services Incorporated

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata